Design analysis report for the 244-AR vault Interim Stabilization interior transfer system
- NHC
The purpose of this calculation note is to verify that the 244-AR Vault Interior Transfer System piping installed in the vault meets ASME B31.3 code requirements. This calculation also evaluates the pipe support loads.
- Research Organization:
- NHC (US)
- Sponsoring Organization:
- USDOE Office of Environmental Management (EM) (US)
- DOE Contract Number:
- AC27-99RL14047
- OSTI ID:
- 808836
- Report Number(s):
- RPP-13862, Rev.0; EDT-635985
- Country of Publication:
- United States
- Language:
- English
Similar Records
244-AR Vault Interim Stabilization Project Plan
Design Analysis Report for 244-AR Interim Stabilization Exhaust Ventilation Ducting
244-CR Vault Interim Stabilization Project Plan
Technical Report
·
Thu Mar 23 23:00:00 EST 2000
·
OSTI ID:801868
Design Analysis Report for 244-AR Interim Stabilization Exhaust Ventilation Ducting
Technical Report
·
Wed Nov 20 23:00:00 EST 2002
·
OSTI ID:808406
244-CR Vault Interim Stabilization Project Plan
Technical Report
·
Tue Apr 25 00:00:00 EDT 2000
·
OSTI ID:803013