Technical Status Report Operability of the CAM [SEC 1 & 2]
- CHG
Report documenting calculations for stack CAM interlock actuation time, & emission release dose consequences in the event of an FSAR-defined failure of a HEPA filter system.
- Research Organization:
- CHG (US)
- Sponsoring Organization:
- USDOE Office of Environmental Management (EM) (US)
- DOE Contract Number:
- AC27-99RL14047
- OSTI ID:
- 807755
- Report Number(s):
- RPP-10799, Rev.0; EDT-631971
- Country of Publication:
- United States
- Language:
- English
Similar Records
Operability of the Ventilation Continuous Air Monitor (CAM) Interlock Analysis of Proposed Upgrade to the 241AW Farm Primary Exhauster CAM System
HEPA Filter Differential Pressure Fan Interlock System Functional Requirements and Technical Design Criteria
Plutonium Finishing Plant (PFP) Waste Composition and High Efficiency Particulate Air Filter Loading
Technical Report
·
Wed Jun 19 00:00:00 EDT 2002
·
OSTI ID:808109
HEPA Filter Differential Pressure Fan Interlock System Functional Requirements and Technical Design Criteria
Technical Report
·
Thu May 11 00:00:00 EDT 2000
·
OSTI ID:803661
Plutonium Finishing Plant (PFP) Waste Composition and High Efficiency Particulate Air Filter Loading
Technical Report
·
Sun Dec 10 23:00:00 EST 2000
·
OSTI ID:805655