System Configuration Management Implementation Procedure for the Canister Storage Building (CSB)
- FH
This document provides configuration management for the Distributed Control System (DCS), the Gaseous Effluent Monitoring System (GEMS-100) System, the Heating Ventilation and Air Conditioning (HVAC) Programmable Logic Controller (PLC), the Canister Receiving Crane (CRC) CRN-001 PLC, and both North and South vestibule door interlock system PLCs at the Canister Storage Building (CSB). This procedure identifies and defines software configuration items in the CSB control and monitoring systems, and defines configuration control throughout the system life cycle. Components of this control include: configuration status accounting; physical protection and control; and verification of the completeness and correctness of these items.
- Research Organization:
- FH (US)
- Sponsoring Organization:
- USDOE Office of Environmental Management (EM) (US)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 805457
- Report Number(s):
- SNF-7095, Rev.1; ECN-663443
- Country of Publication:
- United States
- Language:
- English
Similar Records
System Configuration Management Implementation Procedure for the Canister Storage Building (CSB)
Radiological considerations regarding an alternate method for the placement of intermediate impact absorbers at the Canister Storage Building (CSB)
D0 General Support: The Use of Programmable Logic Controllers (PLCS) at D0
Technical Report
·
Fri Sep 22 00:00:00 EDT 2000
·
OSTI ID:804804
Radiological considerations regarding an alternate method for the placement of intermediate impact absorbers at the Canister Storage Building (CSB)
Technical Report
·
Mon Mar 31 23:00:00 EST 2003
·
OSTI ID:811853
D0 General Support: The Use of Programmable Logic Controllers (PLCS) at D0
Technical Report
·
Fri May 05 00:00:00 EDT 2000
·
OSTI ID:1032083