Software Configuration Management Plan for the K West Basin Integrated Water Treatment System (IWTS) Project A.9
This document provides a configuration control plan for the software associated with the operation and control of the Integrated Water Treatment System (IWTS). It establishes requirements for ensuring configuration item identification, configuration control, configuration status accounting, defect reporting and resolution of computer software. It is written to comply with HNF-SD-SNF-CM-001, Spent Nuclear Fuel Configuration Management Plan (Forehand 1998) and HNF-PRO-309 Computer Software Quality Assurance Requirements, and applicable sections of administrative procedure CM-6-037-00, SNF Project Process Automation Software and Equipment.
- Research Organization:
- Fluor Hanford, Richland, WA (United States)
- Sponsoring Organization:
- ENVIRONMENTAL MANAGEMENT (US)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 803693
- Report Number(s):
- SNF-6247, Rev.0; EDT-624969; TRN: US0301640
- Resource Relation:
- Other Information: PBD: 1 May 2000
- Country of Publication:
- United States
- Language:
- English
Similar Records
System Configuration Management Implementation Procedure for the Canister Storage Building (CSB)
System Configuration Management Implementation Procedure for the Cold Vacuum Drying Facility Monitoring and Control System
Saltwell Leak Detector Station Programmable Logic Controller (PLC) Software Configuration Management Plan (SCMP)
Technical Report
·
Fri Sep 22 00:00:00 EDT 2000
·
OSTI ID:803693
System Configuration Management Implementation Procedure for the Cold Vacuum Drying Facility Monitoring and Control System
Technical Report
·
Wed Oct 11 00:00:00 EDT 2000
·
OSTI ID:803693
Saltwell Leak Detector Station Programmable Logic Controller (PLC) Software Configuration Management Plan (SCMP)
Technical Report
·
Tue Nov 28 00:00:00 EST 2000
·
OSTI ID:803693