skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: 105 K West Cask Transportation Facility Modification Acceptance for Beneficial Use Checklist Project A.5 and A.6

Abstract

The CTFM Subproject of the SNF Project has prepared an ABU checklist per SNF Administrative Procedure (AP) CS-6-019. This checklist identifies the essential documentation needed to operate and maintain the 105 KW CTFM/CLS Structures, Systems, and Components (SSCs) when ownership is transferred from the CTFM Subproject to K Basins Operations. Approval of this supporting document demonstrates an agreement by the approvers as to the documentation required at turnover.

Authors:
Publication Date:
Research Org.:
FH (US)
Sponsoring Org.:
ENVIRONMENTAL MANAGEMENT (US)
OSTI Identifier:
803691
Report Number(s):
SNF-6241, Rev.0
EDT-629210; TRN: US0301615
DOE Contract Number:  
AC06-96RL13200
Resource Type:
Technical Report
Resource Relation:
Other Information: PBD: 5 May 2000
Country of Publication:
United States
Language:
English
Subject:
11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS; SPENT FUEL CASKS; DOCUMENTATION; TRANSPORT; FUEL STORAGE POOLS

Citation Formats

HARRIS, D.L. 105 K West Cask Transportation Facility Modification Acceptance for Beneficial Use Checklist Project A.5 and A.6. United States: N. p., 2000. Web. doi:10.2172/803691.
HARRIS, D.L. 105 K West Cask Transportation Facility Modification Acceptance for Beneficial Use Checklist Project A.5 and A.6. United States. doi:10.2172/803691.
HARRIS, D.L. Fri . "105 K West Cask Transportation Facility Modification Acceptance for Beneficial Use Checklist Project A.5 and A.6". United States. doi:10.2172/803691. https://www.osti.gov/servlets/purl/803691.
@article{osti_803691,
title = {105 K West Cask Transportation Facility Modification Acceptance for Beneficial Use Checklist Project A.5 and A.6},
author = {HARRIS, D.L.},
abstractNote = {The CTFM Subproject of the SNF Project has prepared an ABU checklist per SNF Administrative Procedure (AP) CS-6-019. This checklist identifies the essential documentation needed to operate and maintain the 105 KW CTFM/CLS Structures, Systems, and Components (SSCs) when ownership is transferred from the CTFM Subproject to K Basins Operations. Approval of this supporting document demonstrates an agreement by the approvers as to the documentation required at turnover.},
doi = {10.2172/803691},
journal = {},
number = ,
volume = ,
place = {United States},
year = {2000},
month = {5}
}