Title: CTUIR Grande Ronde River Basin Watershed Restoration Program McCoy Creek/McIntyre Creek Road Crossing, 1996-1998 Progress Report.

Technical Report ·
DOI:https://doi.org/10.2172/803578· OSTI ID:803578

This Annual Report provides a detailed overview of watershed restoration accomplishments achieved by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and project partners in the Upper Grande Ronde River Basin under contract with the Bonneville Power Administration (BPA) during the period July 1, 1997 through June 30, 1998. The Contract Agreement entitled McCoy Meadows Watershed Restoration Project (Project No.96-83-01) includes habitat restoration planning, design, and implementation in two project areas--the McCoy Meadows Ranch located in the Meadow, McCoy, and McIntyre Creek subbasins on private land and the Mainstem Grande Ronde River Habitat Enhancement Project located on private and National Forest System lands near Bird Tract Springs along the Grande Ronde River. During the contract period, the CTUIR and partners (Mark and Lorna Tipperman, landowners), Oregon Department of Environmental Quality (ODEQ), U.S. Environmental Protection Agency (EPA), Oregon Department of Fish and Wildlife (ODFW), and Natural Resource Conservation Service (NRCS) initiated phase 1 construction of the McCoy Meadows Restoration Project. Phase 1 involved reintroduction of a segment of McCoy Creek from its existing channelized configuration into a historic meander channel. Project efforts included bioengineering and tree/shrub planting and protection, transporting salvaged cottonwood tree boles and limbs from offsite source to the project area for utilization by resident beaver populations for forage and dam construction materials, relocation of existing BPA/ODFW riparian corridor fencing to outer edges of meadow floodplain, establishment of pre-project photo points, and coordination of other monitoring and evaluation efforts being led by other project partners including groundwater monitoring wells, channel cross sections, water quality monitoring stations, juvenile population sampling index sites, redd surveys, and habitat surveys. Project activities also included coordination with the U.S. Forest Service, Wallowa-Whitman National Forest, LaGrande Ranger District (USFS) on the Forest Road 2137 (McIntyre Road) Relocation and Obliteration Project and the McCoy Creek crossing. The USFS completed engineering designs under the cooperative effort for the McCoy Creek crossing. Project activities accomplished on the Upper Mainstem Large Wood Addition Project included placement of approximately 120 whole trees to enhance instream structural diversity, pool habitat quality, streambank stability, and improved floodplain morphology. Project activities accomplished on the Mainstem Grande Ronde Habitat Enhancement Project included coordination with landowners (Shauna Musgrove of Cuhna Ranches, Dean Stone, and the Wallowa-Whitman National Forest, LaGrande Ranger District) to develop a habitat enhancement/restoration project opportunity along a 3 mile section of the mainstem Grande Ronde River and major tributaries including the lower reaches of Bear Creek and Jordan Creek. Upon securing an agreement with the landowners, project partners including the CTUIR, ODFW, NRCS, and USFS initiated development of project objectives and site-specific designs. By June 1998, project designs were completed and preparations nearly complete to initiate onsite project construction.

Research Organization:
Confederated Tribes of the Umatilla Reservation, Oregon.
Sponsoring Organization:
United States. Bonneville Power Administration.
DOE Contract Number:
00006229
OSTI ID:
803578
Report Number(s):
DOE/BP-00006229-1; R&D Project: 199608300; TRN: US200302%%290
Resource Relation:
Other Information: PBD: 1 Jul 1999
Country of Publication:
United States
Language:
English