skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Operational Test Report (OTR) for U-103 Pumping and Instrumentation and Control (PIC) Skid

Technical Report ·
DOI:https://doi.org/10.2172/801327· OSTI ID:801327

Attached is the completed Operation Test Procedure (OTP-200-004, Rev. A-16). OTP includes a print out of the Programmable Logic Controller (PLC) Ladder Diagram. Ladder Diagram was designed for installation in the PLC used to monitor and control pumping activity for Tank Farm 241-U-103. The completed OTP and OTR are referenced in the 25 PIC Skid Configuration Drawing (H-2-829998).

Research Organization:
CH2M Hill Hanford Group, Inc., Richland, WA (United States)
Sponsoring Organization:
ENVIRONMENTAL MANAGEMENT (US)
DOE Contract Number:
AC06-96RL13200
OSTI ID:
801327
Report Number(s):
HNF-5820, Rev.0; EDT-618010; TRN: US0300363
Resource Relation:
Other Information: PBD: 28 Feb 2000
Country of Publication:
United States
Language:
English