Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Hydrologic Behavior of Two Engineered Barriers Following Extreme Wetting

Technical Report ·
DOI:https://doi.org/10.2172/799880· OSTI ID:799880
 [1]
  1. Idaho National Engineering and Environmental Laboratory
Many engineered barriers are expected to function for hundreds of years or longer. Over the course of time, it is likely that some barriers will experience infiltration to the point of breakthrough. This study compares the recovery from breakthrough of two storage- evapotranspiration type engineered barriers. Replicates of test plots comprising thick soil and capillary/biobarrier covers were wetted to breakthrough in 1997. Test plots were kept cleared of vegetation to maximize hydrologic stress during recovery. Following cessation of drainage resulting from the wetting irrigations, water storage levels in all plots were at elevated levels compared to pre-irrigation levels. As a result, infiltration of melting snow during the subsequent spring overloaded the storage capacity and produced drainage in all plots. Relatively rapid melting of accumulated snowfall produced the most significant infiltration events each year during the study. Capillary barriers yielded less total drainage than thick soil barriers. By limiting drainage, capillary barriers increased water storage in the upper portions of the test plots, which led to increased evaporation from the capillary barrier plots compared to thick soil plots. Increased evaporation in the capillary barrier plots allowed more water to infiltrate in the second season following the wetting tests without triggering drainage. All thick soil plots again yielded drainage in the second season. Within two years of intentionally induced breakthrough, evaporation alone (without transpiration) restored the capability of the capillary barrier covers to function as intended, although water storage in these covers remained at elevated levels.
Research Organization:
Idaho National Engineering and Environmental Laboratory, Idaho Falls, ID (US)
Sponsoring Organization:
USDOE Office of Environmental Management (EM) (US)
DOE Contract Number:
AC07-99ID13727
OSTI ID:
799880
Report Number(s):
INEEL/EXT-2000-00602
Country of Publication:
United States
Language:
English

Similar Records

Engineered Barrier Testing at the INEEL Engineered Barriers Test Facility: FY-1997 and FY-1999
Technical Report · Tue Sep 01 00:00:00 EDT 1998 · OSTI ID:5163

Performance evaluation of a field-scale surface barrier
Journal Article · Thu May 01 00:00:00 EDT 1997 · Journal of Environmental Quality · OSTI ID:494209

Field Lysimeter Test Facility status report IV: FY 1993
Technical Report · Fri Oct 01 00:00:00 EDT 1993 · OSTI ID:10194920