skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: COMMISSIONING OF RHIC AT 100 GEV / NUCLEON.

Conference ·
OSTI ID:798213

This report describes commissioning of the Relativistic Heavy Ion Collider (RHIC) for 100 GeV/nucleon collisions at designed luminosity. To achieve these goals new systems had to be commissioned: Gamma-t transition crossing jump quadrupoles, rebucketing with the new RF storage cavities, phase lock loop feedback, betatron and crystal collimation, beta squeeze along the ramp, Siberian snake magnets for the proton polarization run, AC dipole system chromaticity measurements along the acceleration ramp, orbit correction, new ramp management system, upgraded sequencer, new data instrumentation and logger acquisition system etc.

Research Organization:
Brookhaven National Lab. (BNL), Upton, NY (United States)
Sponsoring Organization:
USDOE Office of Energy Research (ER) (US)
DOE Contract Number:
AC02-98CH10886
OSTI ID:
798213
Report Number(s):
BNL-69008; R&D Project: AD003; KA0202011; TRN: US0203965
Resource Relation:
Conference: PARTICLE ACCELERATOR CONFERENCE 2002, PARIS (FR), 06/02/2002--06/07/2002; Other Information: PBD: 2 Jun 2002
Country of Publication:
United States
Language:
English

Similar Records

RHIC Polarized proton operation
Conference · Mon Mar 28 00:00:00 EDT 2011 · OSTI ID:798213

RHIC SPIN FLIPPER COMMISSIONING.
Conference · Sun Jun 02 00:00:00 EDT 2002 · OSTI ID:798213

RHIC instrumentation
Journal Article · Thu Dec 10 00:00:00 EST 1998 · AIP Conference Proceedings · OSTI ID:798213