Project W-314 acceptance test report HNF-4643 for HNF-4642 241-AN-A valve pit manifold valves and position indication for project W-314
The purpose of the test was to verify that the AN Tank Farm Manifold Valves can be manually manipulated to the required operating position and that the electrical and visual indications accurately reflect that position. Physical locking devices were also verified to function. The Acceptance Test Procedure HNF-4642, 241-AN-A Valve Pit Manifold Valves and Position Indication was conducted between 23 June and 10 August 1999 at the 200E AN Tank Farm. The test has no open test exceptions. The test was conducted prior to final engineering ''as built'' activities being completed, this had an impact on the procedure and test results, ECN 653752 was written to correct the mismatch between the procedure and actual field conditions. P&ID H-14-100941 was changed via ECN-W-314-4C-120. All components, identified in the procedure, were not found to be labeled and identified as written in the procedure, temporary tags were used for operational identification. A retest of valve ANA-WT-V 318 was required because it was removed from its installed position and modified after testing was completed.
- Research Organization:
- TRS (US)
- Sponsoring Organization:
- ENVIRONMENTAL MANAGEMENT (US)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 798030
- Report Number(s):
- HNF-4643, Rev.0; TRN: US0204329
- Resource Relation:
- Other Information: PBD: 22 Sep 1999
- Country of Publication:
- United States
- Language:
- English
Similar Records
Project W-314 acceptance test report HNF-4651 for HNF-4650 SN-268 encasement leak detection ANA-WT-LDSTA-335 for project W-314
Project W-314 acceptance test report HNF-4647 for HNF-4646 241-B pit leak detection ANB-WT-LDSTA-231 for project W-314