6430.1A Compliance Matrix for 241-SY-101 Surface Level Rise Remediation Project
Tank 241-SY-101 (SY-101) has recently exhibited a steady waste surface level growth. A path forward to mitigate the SY-101 surface level growth issue has been developed. The project has been directed to install the necessary equipment to transfer 380-570m{sup 3} (100,000-150,000 gallons) of waste from SY-101 to SY-102 before the waste elevation reached the region of the tank where the transition from a double to a single shell tank occurs. The purpose of this document is to record the design attributes of the RAPID mitigation system which fulfill the requirements specified in DOE order 6430.1A as it relates to the 241-SY-101 RAPID Mitigation System.
- Research Organization:
- LMHC (US)
- Sponsoring Organization:
- ENVIRONMENTAL MANAGEMENT (US)
- DOE Contract Number:
- AC27-99RL14047
- OSTI ID:
- 797751
- Report Number(s):
- RPP-4993, Rev.0; TRN: US0204985
- Resource Relation:
- Other Information: PBD: 18 Aug 1999
- Country of Publication:
- United States
- Language:
- English
Similar Records
6430.1A Compliance Matrix for 241-SY-101 Surface Level Rise Remediation Project
Process Control Plan for Tank 241-SY-101 Surface Level Rise Remediation
Hazard evaluation for transfer of waste from tank 241-SY-101 to tank 241-SY-102
Technical Report
·
Fri Oct 08 00:00:00 EDT 1999
·
OSTI ID:797751
Process Control Plan for Tank 241-SY-101 Surface Level Rise Remediation
Technical Report
·
Tue Sep 28 00:00:00 EDT 1999
·
OSTI ID:797751
Hazard evaluation for transfer of waste from tank 241-SY-101 to tank 241-SY-102
Technical Report
·
Fri Feb 12 00:00:00 EST 1999
·
OSTI ID:797751