Seismic Adequacy Review of PC012 SCEs that are Potential Seismic Hazards with PC3 SCEs at Cold Vacuum Dryer (CVD) Facility
This document provides seismic adequacy review of PCO12 Systems, Components L Equipment anchorage that are potential seismic interaction hazards with PC3 SCEs during a Design Basis Earthquake. The PCO12 items are identified in the Safety Equipment List as 3/1 SCEs.
- Research Organization:
- FDNW (US)
- Sponsoring Organization:
- ENVIRONMENTAL MANAGEMENT (US)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 797683
- Report Number(s):
- HNF-4291, Rev.0; TRN: US0201968
- Resource Relation:
- Other Information: PBD: 12 Aug 1999
- Country of Publication:
- United States
- Language:
- English
Similar Records
Fire Hazard Analysis for the Cold Vacuum Drying facility (CVD) Facility
Cold Vacuum Drying (CVD) Facility Hazards Analysis Report
Cold Vacuum Drying (CVD) Facility Hazards Analysis Report
Technical Report
·
Wed Sep 06 00:00:00 EDT 2000
·
OSTI ID:797683
Cold Vacuum Drying (CVD) Facility Hazards Analysis Report
Technical Report
·
Wed Oct 20 00:00:00 EDT 1999
·
OSTI ID:797683
Cold Vacuum Drying (CVD) Facility Hazards Analysis Report
Technical Report
·
Mon Aug 07 00:00:00 EDT 2000
·
OSTI ID:797683