Plutonium Disposition by Immobilization
Conference
·
OSTI ID:791293
- LLNL
The ultimate goal of the Department of Energy (DOE) Immobilization Project is to develop, construct, and operate facilities that will immobilize between 17 to 50 tonnes (MT) of U.S. surplus weapons-usable plutonium materials in waste forms that meet the ''spent fuel'' standard and are acceptable for disposal in a geologic repository. Using the ceramic can-in-canister technology selected for immobilization, surplus plutonium materials will be chemically combined into ceramic forms which will be encapsulated within large canisters of high level waste (HLW) glass. Deployment of the immobilization capability should occur by 2008 and be completed within 10 years. In support of this goal, the DOE Office of Fissile Materials Disposition (MD) is conducting development and testing (D&T) activities at four DOE laboratories under the technical leadership of Lawrence Livermore National Laboratory (LLNL). The Savannah River Site has been selected as the site for the planned Plutonium Immobilization Plant (PIP). The D&T effort, now in its third year, will establish the technical bases for the design, construction, and operation of the U. S. capability to immobilize surplus plutonium in a suitable and cost-effective manner. Based on the D&T effort and on the development of a conceptual design of the PIP, automation is expected to play a key role in the design and operation of the Immobilization Plant. Automation and remote handling are needed to achieve required dose reduction and to enhance operational efficiency.
- Research Organization:
- Lawrence Livermore National Lab., Livermore, CA (US)
- Sponsoring Organization:
- USDOE Office of Defense Programs (DP) (US)
- DOE Contract Number:
- W-7405-ENG-48
- OSTI ID:
- 791293
- Report Number(s):
- UCRL-JC-137918
- Country of Publication:
- United States
- Language:
- English
Similar Records
Integrated development and testing plan for the plutonium immobilization project
Integrated development and testing plan for the plutonium immobilization project
Design-Only Conceptual Design Report: Plutonium Immobilization Plant
Technical Report
·
Wed Jul 01 00:00:00 EDT 1998
·
OSTI ID:16772
Integrated development and testing plan for the plutonium immobilization project
Technical Report
·
Sun Mar 26 23:00:00 EST 2000
·
OSTI ID:757033
Design-Only Conceptual Design Report: Plutonium Immobilization Plant
Technical Report
·
Thu Dec 31 23:00:00 EST 1998
·
OSTI ID:791623