TESTING PROCEDURES AND RESULTS OF THE PROTOTYPE FUNDAMENTAL POWER COUPLER FOR THE SPALLATION NEUTRON SOURCE*
- ORNL
High-power RF testing with peak power in excess of 500 kW has been performed on prototype Fundamental Power Couplers (FPC) for the Spallation Neutron Source superconducting (SNS) cavities. The testing followed the development of procedures for cleaning, assembling and preparing the FPC for installation in the test stand. The qualification of the couplers has occurred for the time being only in a limited set of conditions (travelling wave, 20 pps) as the available RF system and control instrumentation are under improvement.
- Research Organization:
- Oak Ridge National Lab., TN (US)
- Sponsoring Organization:
- US Department of Energy (US)
- DOE Contract Number:
- AC05-00OR22725
- OSTI ID:
- 788516
- Report Number(s):
- P01-111128
- Country of Publication:
- United States
- Language:
- English
Similar Records
TESTING PROCEDURES AND RESULTS OF THE PROTOTYPE FUNDAMENTAL POWER COUPLER FOR THE SPALLATION NEUTRON SOURCE
Testing Procedures and Results of the Prototype Fundamental Power Coupler for the Spallation Neutron Source
The Prototype Fundamental Power Coupler For The Spallation Neutron Source Superconducting Cavities: Design And Initial Test Results
Conference
·
Fri Jun 01 00:00:00 EDT 2001
·
OSTI ID:783272
Testing Procedures and Results of the Prototype Fundamental Power Coupler for the Spallation Neutron Source
Conference
·
Fri Jun 01 00:00:00 EDT 2001
·
OSTI ID:783628
The Prototype Fundamental Power Coupler For The Spallation Neutron Source Superconducting Cavities: Design And Initial Test Results
Conference
·
Sat Sep 01 00:00:00 EDT 2001
·
OSTI ID:786469