Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Construction of the CEBAF RF Separator

Conference ·
The CEBAF accelerator is designed in a multipass racetrack configuration, with two 1497 MHz linear accelerator sections joined by independent magnetic transport arcs. Room temperature subharmonic rf separator cavities will be used on each independent arc to extract a portion of the recirculating beam, and one additional cavity will be used to divide the final full-energy beam between CEBAF's three experimental end stations. A single-cell prototype cavity has already been built and tested a low power levels. The next stage of the design process is the construction of a cavity capable of operation at full power, i.e. at a gradient sufficient to provide the required mu-rad bend to a 6 GeV beam. The paper will discuss both the electrical and mechanical design of the cavity, construction techniques employed, and preliminary test results.
Research Organization:
Thomas Jefferson National Accelerator Facility, Newport News, VA (US)
Sponsoring Organization:
USDOE Office of Energy Research (ER) (US)
DOE Contract Number:
AC05-84ER40150
OSTI ID:
787856
Report Number(s):
CEBAF-PR-93-043; DOE/ER/40150-1927
Country of Publication:
United States
Language:
English

Similar Records

CEBAF RF separator system
Conference · Sun Sep 01 00:00:00 EDT 1996 · OSTI ID:756683

Design of CEBAF's (Continuous Electron Beam Accelerator Facility) rf separator and results of cold tests
Conference · Sat Dec 31 23:00:00 EST 1988 · OSTI ID:5610139

A New RF System for the CEBAF Normal Conducting Cavities
Conference · Sun Aug 01 00:00:00 EDT 2004 · OSTI ID:827980