Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Hydrostatic Level System for Slow Ground Motion Studies at FERMILAB and SLAC

Technical Report ·
DOI:https://doi.org/10.2172/784988· OSTI ID:784988
A series of new ground motion studies using an upgraded hydrostatic level system are planned at Fermilab and SLAC in collaboration with BINP. To better characterize both the spatial and temporal characteristics of slow ground motion, these studies will use large number of probes and will also be performed in several geologically different locations. The hydrostatic level system used in ongoing measurements near Fermilab [1] suffers from uncertainty of temperature fluctuation effects. This paper presents improvements to be incorporated into the upgraded hydrostatic level system, present status, and the plan for experimental studies.
Research Organization:
Stanford Linear Accelerator Center, Menlo Park, CA (US)
Sponsoring Organization:
USDOE Office of Energy Research (ER) (US)
DOE Contract Number:
AC03-76SF00515;
OSTI ID:
784988
Report Number(s):
SLAC-PUB-8897
Country of Publication:
United States
Language:
English

Similar Records

Ground Motion Model of the SLAC Site
Technical Report · Wed Aug 30 20:00:00 EDT 2000 · OSTI ID:764992

LONG TERM STABILITY STUDY AT FNAL AND SLAC USING BINP DEVELOPED HYDROSTATIC LEVEL SYSTEM
Technical Report · Tue May 27 20:00:00 EDT 2003 · OSTI ID:813163

Hydro static water level systems at Fermilab
Conference · Fri Sep 01 00:00:00 EDT 2006 · ECONF C06092511:WEPO26,2006 · OSTI ID:897257