BEAM PARAMETERS OF THE AGS SYNCHROTRON DURING FAST BEAM EXTRACTION AT THE LOCATION OF THE AGS KICKER.
Conference
·
OSTI ID:784214
- BROOKHAVEN NATIONAL LABORATORY
The longitudinal requirements for the AGS to RHIC transfer process requires a precise control of the radius and frequency of the circulating bunches in the AGS just before the bunch extraction from the AGS and subsequent. injection into RHIC via the ATR transfer line. In addition the transverse beam parameters in the AGS at the location of the Extraction kicker define the ''beam-matching'' between the ATR line and RHIC. In this paper we present theoretical and experimental results related to the longitudinal and transverse parameters of the AGS.
- Research Organization:
- Brookhaven National Lab., Upton, NY (US)
- Sponsoring Organization:
- USDOE Office of Energy Research (ER) (US)
- DOE Contract Number:
- AC02-98CH10886
- OSTI ID:
- 784214
- Report Number(s):
- BNL--67953; KA0201; KA0201
- Country of Publication:
- United States
- Language:
- English
Similar Records
R_transport_matrices of the Fast Extraction Beam (FEB) of the AGS, and Beam Parameters at the Starting point of the AtR Line
SYNTHESIZER CONTROLLED BEAM TRANSFER FROM THE AGS TO RHIC.
Transfer of a polarized proton beam from AGS to RHIC
Technical Report
·
Mon Dec 31 23:00:00 EST 2007
·
OSTI ID:939968
SYNTHESIZER CONTROLLED BEAM TRANSFER FROM THE AGS TO RHIC.
Conference
·
Mon Jun 18 00:00:00 EDT 2001
·
OSTI ID:783168
Transfer of a polarized proton beam from AGS to RHIC
Conference
·
Tue Jul 01 00:00:00 EDT 1997
·
OSTI ID:495794