Engineering task plan for the development, fabrication and installation of rotary mode core sample truck grapple hoist box level wind system
This Engineering Task Plan is to design, generate fabrication drawings, fabricate, test, and install the grapple hoist level wind system for Rotary Mode Core Sample Trucks (RMCST) 3 and 4. Deliverables will include generating fabrication drawings, fabrication of one level wind system, updating fabrication drawings as required, and installation of level wind systems on RMCST 3 or 4. The installation of the level wind systems will be done during a preventive maintenance outage.
- Research Organization:
- Hanford Site (HNF), Richland, WA (United States)
- Sponsoring Organization:
- US DOE Office of Environmental Management (US)
- DOE Contract Number:
- AC06-96RL13200
- OSTI ID:
- 782305
- Report Number(s):
- HNF-3873-REV0; TRN: US0203122
- Resource Relation:
- Other Information: PBD: 12 May 1999
- Country of Publication:
- United States
- Language:
- English
Similar Records
Test Plan for Rotary Mode Core Sample Truck Grapple Hoist Level Wind System
Test Plan for Rotary Mode Core Sample Truck Grapple Hoist Level Wind System
Engineering tasl plan for the development, fabrication and installation of rotary mode core sample truck bellows
Technical Report
·
Thu Dec 09 00:00:00 EST 1999
·
OSTI ID:782305
Test Plan for Rotary Mode Core Sample Truck Grapple Hoist Level Wind System
Technical Report
·
Wed Aug 18 00:00:00 EDT 1999
·
OSTI ID:782305
Engineering tasl plan for the development, fabrication and installation of rotary mode core sample truck bellows
Technical Report
·
Thu Jun 24 00:00:00 EDT 1999
·
OSTI ID:782305