RF SYSTEM FOR THE SNS ACCUMULATOR RING.
Conference
·
OSTI ID:782062
- BROOKHAVEN NATIONAL LABORATORY
During accumulation the RF beam current in the spallation neutron source ring rises from 0 to 50 amperes. A clean, 250 nanosecond gap is needed for the extraction kicker risetime. Large momentum spread and small peak current are needed to prevent instabilities and stopband related losses. A robust RF system meeting these requirements has been designed.
- Research Organization:
- Brookhaven National Lab., Upton, NY (US)
- Sponsoring Organization:
- USDOE Office of Energy Research (ER) (US)
- DOE Contract Number:
- AC02-98CH10886
- OSTI ID:
- 782062
- Report Number(s):
- BNL--67992; KC0204019; KC0204019
- Country of Publication:
- United States
- Language:
- English
Similar Records
SNS Accumulator Ring Extraction Fast Kicker Modulator Initial Simulation
MEASUREMENTS OF COUPLING IMPEDANCE FOR THE SNS ACCUMULATOR RING.
HIGH LEVEL RF FOR THE SNS RING.
Technical Report
·
Fri Sep 25 00:00:00 EDT 1998
·
OSTI ID:1157229
MEASUREMENTS OF COUPLING IMPEDANCE FOR THE SNS ACCUMULATOR RING.
Conference
·
Fri Jun 30 00:00:00 EDT 2000
·
OSTI ID:779670
HIGH LEVEL RF FOR THE SNS RING.
Conference
·
Mon Jun 03 00:00:00 EDT 2002
·
OSTI ID:797130