Project W-211, initial tank retrieval systems, retrieval control system software configuration management plan

Technical Report ·
DOI:https://doi.org/10.2172/781535· OSTI ID:781535

This Software Configuration Management Plan (SCMP) provides the instructions for change control of the W-211 Project, Retrieval Control System (RCS) software after initial approval/release but prior to the transfer of custody to the waste tank operations contractor. This plan applies to the W-211 system software developed by the project, consisting of the computer human-machine interface (HMI) and programmable logic controller (PLC) software source and executable code, for production use by the waste tank operations contractor. The plan encompasses that portion of the W-211 RCS software represented on project-specific AUTOCAD drawings that are released as part of the C1 definitive design package (these drawings are identified on the drawing list associated with each C-1 package), and the associated software code. Implementation of the plan is required for formal acceptance testing and production release. The software configuration management plan does not apply to reports and data generated by the software except where specifically identified. Control of information produced by the software once it has been transferred for operation is the responsibility of the receiving organization.

Research Organization:
HNF Hanford Site (US)
Sponsoring Organization:
US DOE Office of Environmental Management (US)
DOE Contract Number:
AC06-96RL13200
OSTI ID:
781535
Report Number(s):
HNF--SD--WM-CSCM-036--REV1; 39EW31301; 39EW31301