Title: Fire hazard analysis for Plutonium Finishing Plant complex

Technical Report ·
DOI:https://doi.org/10.2172/781533· OSTI ID:781533

A fire hazards analysis (FHA) was performed for the Plutonium Finishing Plant (PFP) Complex at the Department of Energy (DOE) Hanford site. The scope of the FHA focuses on the nuclear facilities/structures in the Complex. The analysis was conducted in accordance with RLID 5480.7, [DOE Directive RLID 5480.7, 1/17/94] and DOE Order 5480.7A, ''Fire Protection'' [DOE Order 5480.7A, 2/17/93] and addresses each of the sixteen principle elements outlined in paragraph 9.a(3) of the Order. The elements are addressed in terms of the fire protection objectives stated in paragraph 4 of DOE 5480.7A. In addition, the FHA also complies with WHC-CM-4-41, Fire Protection Program Manual, Section 3.4 [1994] and WHC-SD-GN-FHA-30001, Rev. 0 [WHC, 1994]. Objectives of the FHA are to determine: (1) the fire hazards that expose the PFP facilities, or that are inherent in the building operations, (2) the adequacy of the fire safety features currently located in the PFP Complex, and (3) the degree of compliance of the facility with specific fire safety provisions in DOE orders, related engineering codes, and standards.

Research Organization:
Hanford Site (HNF), Richland, WA (United States)
Sponsoring Organization:
US DOE Office of Environmental Management (US)
DOE Contract Number:
AC06-96RL13200
OSTI ID:
781533
Report Number(s):
HNF-SD-CP-FHA-004-REV0; EW7002010; EW7002010; TRN: US0111155
Resource Relation:
Other Information: PBD: 23 Feb 1999
Country of Publication:
United States
Language:
English

Similar Records

Fire hazards analysis for the uranium oxide (UO{sub 3}) facility
Technical Report · Tue Dec 06 00:00:00 EST 1994 · OSTI ID:781533

Fire Hazard Analysis for the Cold Vacuum Drying facility (CVD) Facility
Technical Report · Wed Sep 06 00:00:00 EDT 2000 · OSTI ID:781533

324 Building fire hazards analysis implementation plan
Technical Report · Wed Sep 16 00:00:00 EDT 1998 · OSTI ID:781533