Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Tritium Release Estimate from CLWR-Tritium Extraction Facility Waste Overpack

Technical Report ·
DOI:https://doi.org/10.2172/781208· OSTI ID:781208

Spent targets (Tritium Producing Burnable Absorber Rods, TPBARs) from the Commercial Light Water Reactor-Tritium Extraction Facility (CLWR-TEF) at the Savannah River Site will be sent to waste disposal contained in a so-called ''overpack''. The tritium permeation rate through a welded stainless steel overpack was estimated using a finite difference computer program in a previous report. This report is an evaluation of tritium permeation through three additional overpack designs: (1) a stainless steel overpack sealed using a mechanical closure with a metal gasket, (2) a mild steel overpack with the same mechanical closure, and (3) an aluminum overpack sealed by welding.

Research Organization:
Savannah River Site (US)
Sponsoring Organization:
US Department of Energy (US)
DOE Contract Number:
AC09-96SR18500
OSTI ID:
781208
Report Number(s):
WSRC-TR-2001-00095
Country of Publication:
United States
Language:
English

Similar Records

Tritium Permeation Estimate from APT and CLWR-TEF Waste Packages
Technical Report · Wed Mar 17 23:00:00 EST 1999 · OSTI ID:4761

Commercial Light Water Reactor -Tritium Extraction Facility Process Waste Assessment (Project S-6091)
Technical Report · Sat Nov 29 23:00:00 EST 1997 · OSTI ID:586858

Material Handling in the Tritium Extraction Facility at Savannah River Site
Conference · Sun Jan 10 23:00:00 EST 1999 · OSTI ID:4863