Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Sandia National Laboratories/New Mexico Facilities and Safety Information Document [NOTE: Volume I, Chapters 2 through 5]

Technical Report ·
DOI:https://doi.org/10.2172/777069· OSTI ID:777069
The Facilities Business Unit, which includes the Operations and Engineering Center (7800) and the Facilities Management Center (7900), coordinates decisions about the management of facilities, infrastructure, and sites. These decisions include the following: New construction, including siting; Rehabilitation, and renovation; Relocation; Mothballing; Decontamination and decommissioning; and Demolition. Decisions on these matters flow from a corporate decision process in which SNL directors and vice presidents identify the facility and infrastructure requirements for carrying out work for DOE and other customers. DOE and any non-DOE owners of real estate that is leased or permitted to DOE for SNL/NM use must concur with this identification of requirements. Decision-making follows procedures required by DOE and requirements defined by SNL/NM program executives. See Sandia National Laboratories (1997e), Part II, ''Desired Future State and Strategy,'' and appendices to Sandia National Laboratories (1997e) for more information about planning and decision processes. Decisions on siting take surrounding land uses into account and draw on environmental baseline information maintained at SNL/NM. For environmental baseline and land use information, see Sandia National Laboratories (1999).
Research Organization:
Sandia National Labs., Albuquerque, NM (US); Sandia National Labs., Livermore, CA (US)
Sponsoring Organization:
US Department of Energy (US)
DOE Contract Number:
AC04-94AL85000
OSTI ID:
777069
Report Number(s):
SAND99-2126/1
Country of Publication:
United States
Language:
English