Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Engineering development of coal-fired high-performance power systems

Technical Report ·
DOI:https://doi.org/10.2172/775011· OSTI ID:775011

A High Performance Power System (HIPPS) is being developed. This system is a coal-fired, combined cycle plant with indirect heating of gas turbine air. Foster Wheeler Development Corporation and a team consisting of Foster Wheeler Energy Corporation, Bechtel Corporation, University of Tennessee Space Institute and Westinghouse Electric Corporation are developing this system. In Phase 1 of the project, a conceptual design of a commercial plant was developed. Technical and economic analyses indicated that the plant would meet the goals of the project which include a 47 percent efficiency (HHV) and a 10 percent lower cost of electricity than an equivalent size PC plant. The concept uses a pyrolysis process to convert coal into fuel gas and char. The char is fired in a High Temperature Advanced Furnace (HITAF). The HITAF is a pulverized fuel-fired boiler/air heater where steam is generated and gas turbine air is indirectly heated. The fuel gas generated in the pyrolyzer is then used to heat the gas turbine air further before it enters the gas turbine. The project is currently in Phase 2 which includes engineering analysis, laboratory testing and pilot plant testing. Research and development is being done on the HIPPS systems that are not commercial or being developed on other projects. Pilot plant testing of the pyrolyzer subsystem and the char combustion subsystem are being done separately, and after each experimental program has been completed, a larger scale pyrolyzer will be tested at the Power Systems Development Facility (PSDF) in Wilsonville, AL. The facility is equipped with a gas turbine and a topping combustor, and as such, will provide an opportunity to evaluate integrated pyrolyzer and turbine operation. This report addresses the areas of technical progress for this quarter. Analysis of the arch-fired burner continued during this quarter. Unburned carbon and NOx performance are included in this report. Construction commenced this quarter to modify the CETF for horizontal firing. A new indirect feed system will be required to provide a more stable fuel feed to the new wall-fired burner. The conceptual design of the char transfer system for the PSDF is complete. Final detailed design will commence after FETC has completed all cold model testing. DOE-FETC is utilizing an existing experimental facility to evaluate the performance of the proposed char transfer system.

Research Organization:
Federal Energy Technology Center, Morgantown, WV (US); Federal Energy Technology Center, Pittsburgh, PA (US)
Sponsoring Organization:
US Department of Energy (US)
DOE Contract Number:
AC22-95PC95143
OSTI ID:
775011
Report Number(s):
DE--AC22-95PC95143-16
Country of Publication:
United States
Language:
English