Title: Project Execution Plan

Technical Report ·
DOI:https://doi.org/10.2172/774969· OSTI ID:774969

Created in 1989 to address over 50 years of environmental liabilities arising out of nuclear weapons production and testing in the United States since World War II, the U.S. Department of Energy's (DOE's) Environmental Management (EM) Programs decade-long effort to reduce the costs of those environmental liabilities, collectively known as DOE's ''environmental mortgage,'' includes past as well as future cleanup costs associated with environmental contamination, hazardous and radioactive materials and wastes, contaminated buildings and facilities, and their associated risks. Tasked with the bulk of these cleanup efforts, the U.S. Department of Energy, Nevada Operations Office's (DOE/NV's), Nevada Environmental Restoration Project (NV ERP) is attempting to complete applicable corrective actions at inactive contaminated sites and facilities managed by DOE/NV, while at the same time protecting human health and the environment. Regulated under the Federal Facility Agreement and Consent Order, the objectives of the NV ERP are to identify the nature and extent of the contamination, determine its potential risk to the public and the environment, and to perform the necessary corrective actions in compliance with this and other state and federal regulations, guidelines, and requirements. Associated with this vast effort are approximately 2,000 sites both on and off of the Nevada Test Site (NTS) that were used primarily for nuclear testing and are addressed in the NV ERP. This includes sites that were underground areas where tests were actually conducted, contaminated surface soils resulting from aboveground testing activities, and sites that supported other related testing hardware paraphenalia and/or NTS real estate properties (e.g., underground storage tanks, leachfields, landfills, contaminated waste areas, injection wells, muckpiles, and ponds). To assist in this effort, a NV ERP Team was assembled which is composed of organizations from both the public and private sectors. The strategy to be employed for environmental restoration is based on commonality of work and the DOE EM Program's vision to remediate the contaminated sites on a project-specific, site-by-site basis over an approximate ten-year period to be completed by the year 2006.

Research Organization:
IT Corporation, Las Vegas, NV (US)
Sponsoring Organization:
USDOE, Nevada Operations Office (US)
DOE Contract Number:
AC08-97NV13052
OSTI ID:
774969
Report Number(s):
DOE/NV-536; TRN: US0101117
Resource Relation:
Other Information: PBD: 22 Mar 1999