Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Surface Sediments in Precooler Ponds 2, 4, and 5: March 2000

Technical Report ·
DOI:https://doi.org/10.2172/774271· OSTI ID:774271
Pond 2, Pond 4, and Pond 5 are inactive reactor cooling impoundments built in 1961 on the R-Reactor Effluent System in the east-central portion of the Department of Energy's Savannah River Site in Aiken, South Carolina. These precooler ponds are part of the Par Pond cooling water system and are considered part of the Par Pond operable unit. The intent was not to characterize the ponds, but to identify the maximum levels of contamination that could be exposed if the ponds are drained to remove the danger of dam failure.
Research Organization:
Savannah River Site (US)
Sponsoring Organization:
US Department of Energy (US)
DOE Contract Number:
AC09-96SR18500
OSTI ID:
774271
Report Number(s):
WSRC-TR-2000-00164
Country of Publication:
United States
Language:
English

Similar Records

Surface and subsurface soils at the Pond B dam: July 1998
Technical Report · Thu Dec 02 23:00:00 EST 1999 · OSTI ID:750105

Key to the cladocera of Par Pond on the Savannah River Plant
Technical Report · Tue Jun 01 00:00:00 EDT 1982 · OSTI ID:5247133

Ecology of Aeromonas hydrophila in a South Carolina cooling reservoir
Book · Sat Dec 31 23:00:00 EST 1977 · OSTI ID:6671028