Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Pulsed Power Peer Review Committee Report

Technical Report ·
DOI:https://doi.org/10.2172/771500· OSTI ID:771500

In 1993, the Government Performance and Results Act (GPRA, PL 103-62) was enacted. GPRA, which applies to all federal programs, has three components: strategic plans, annual performance plans, and metrics to show how well annual plans are being followed. As part of meeting the GRPA requirement in FY2000, a 14-member external peer review panel (the Garwin Committee) was convened on May 17-19, 2000 to review Sandia National Laboratories' Pulsed Power Programs as a component of the Performance Appraisal Process negotiated with the Department of Energy (DOE). The scope of the review included activities in inertial confinement fission (ICF), weapon physics, development of radiation sources for weapons effects simulation, x-ray radiography, basic research in high energy density physics (HEDP), and pulsed power technology research and development. In his charge to the committee, Jeffrey Quintenz, Director of Pulsed Power Sciences (1600) asked that the review be based on four criteria (1) quality of science, technology, and engineering, (2) programmatic performance, management, and planning, (3) relevance to national needs and agency missions, and (4) performance in the operation and construction of major research facilities. In addition, specific programmatic questions were posed by the director and by the DOE-Defense Programs (DP). The accompanying report, produced as a SAND document, is the report of the committee's findings.

Research Organization:
Sandia National Labs., Albuquerque, NM (US); Sandia National Labs., Livermore, CA (US)
Sponsoring Organization:
US Department of Energy (US)
DOE Contract Number:
AC04-94AL85000
OSTI ID:
771500
Report Number(s):
SAND2000-2515
Country of Publication:
United States
Language:
English

Similar Records

Pulsed Power Peer Review Committee Report
Technical Report · Tue Oct 01 00:00:00 EDT 2002 · OSTI ID:805839

Pulsed power peer review committee report.
Technical Report · Sun Aug 01 00:00:00 EDT 2004 · OSTI ID:919171

Energy and Environment Directorate Status Report March 2006
Technical Report · Mon Feb 20 23:00:00 EST 2006 · OSTI ID:898428