Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Environmental Assessment and Finding of No Significant Impact: Pond B Dam Repair Project at the Savannah River Site

Technical Report ·
DOI:https://doi.org/10.2172/768505· OSTI ID:768505

The Department of Energy (DOE) has prepared an environmental assessment (EA) (DOE/EA-1285) for the proposed repair of the Pond B dam at the Savannah River Site (SRS), located near Aiken, South Carolina. Based on the analyses in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, the preparation of an environmental impact statement (EIS) is not required, and DOE is issuing this Finding of No Significant Impact (FONSI) and Floodplain Statement of Findings.

Research Organization:
U.S. Department of Energy, Savannah River Operations Office (US)
Sponsoring Organization:
USDOE Office of NEPA Policy and Assistance (EH-42) (US)
OSTI ID:
768505
Report Number(s):
DOE/EA-1285
Country of Publication:
United States
Language:
English