skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Canister Transfer System Description Document

Technical Report ·
DOI:https://doi.org/10.2172/765257· OSTI ID:765257

The Canister Transfer System receives transportation casks containing large and small disposable canisters, unloads the canisters from the casks, stores the canisters as required, loads them into disposal containers (DCs), and prepares the empty casks for re-shipment. Cask unloading begins with cask inspection, sampling, and lid bolt removal operations. The cask lids are removed and the canisters are unloaded. Small canisters are loaded directly into a DC, or are stored until enough canisters are available to fill a DC. Large canisters are loaded directly into a DC. Transportation casks and related components are decontaminated as required, and empty casks are prepared for re-shipment. One independent, remotely operated canister transfer line is provided in the Waste Handling Building System. The canister transfer line consists of a Cask Transport System, Cask Preparation System, Canister Handling System, Disposal Container Transport System, an off-normal canister handling cell with a transfer tunnel connecting the two cells, and Control and Tracking System. The Canister Transfer System operating sequence begins with moving transportation casks to the cask preparation area with the Cask Transport System. The Cask Preparation System prepares the cask for unloading and consists of cask preparation manipulator, cask inspection and sampling equipment, and decontamination equipment. The Canister Handling System unloads the canister(s) and places them into a DC. Handling equipment consists of a bridge crane/hoist, DC loading manipulator, lifting fixtures, and small canister staging racks. Once the cask has been unloaded, the Cask Preparation System decontaminates the cask exterior and returns it to the Carrier/Cask Handling System via the Cask Transport System. After the DC is fully loaded, the Disposal Container Transport System moves the DC to the Disposal Container Handling System for welding. To handle off-normal canisters, a separate off-normal canister handling cell is located adjacent to the canister transfer cell and is interconnected to the transfer cell by means of the off-normal canister transfer tunnel. All canister transfer operations are controlled by the Control and Tracking System. The system interfaces with the Carrier/Cask Handling System for incoming and outgoing transportation casks. The system also interfaces with the Disposal Container Handling System, which prepares the DC for loading and subsequently seals the loaded DC. The system support interfaces are the Waste Handling Building System and other internal Waste Handling Building (WHB) support systems.

Research Organization:
Yucca Mountain Project, Las Vegas, NV (United States)
Sponsoring Organization:
US Department of Energy (US)
DOE Contract Number:
AC08-91RW00134
OSTI ID:
765257
Report Number(s):
SDD-CTS-SE-000001 REV 00, ICN 01; MOL.20000807.0079, DC No. 26332; TRN: US0402783
Resource Relation:
Other Information: PBD: 12 Oct 2000; PBD: 12 Oct 2000
Country of Publication:
United States
Language:
English

Similar Records

CANISTER TRANSFER SYSTEM DESCRIPTION DOCUMENT
Technical Report · Fri Jun 23 00:00:00 EDT 2000 · OSTI ID:765257

ASSEMBLY TRANSFER SYSTEM DESCRIPTION DOCUMENT
Technical Report · Mon Jun 26 00:00:00 EDT 2000 · OSTI ID:765257

DISPOSAL CONTAINER HANDLING SYSTEM DESCRIPTION DOCUMENT
Technical Report · Fri Jun 30 00:00:00 EDT 2000 · OSTI ID:765257