Am/Cm Vitrification Process: Pretreatment Material Balance Calculations
This report documents material balance calculations for the pretreatment steps required to prepare the Americium/Curium solution currently stored in Tank 17.1 in the F-Canyon for vitrification. The material balance uses the latest analysis of the tank contents to provide a best estimate calculation of the expected plant operations during the pretreatment process. The material balance calculations primarily follow the material that directly leads to melter feed. Except for vapor products of the denitration reactions and treatment of supernate from precipitation and precipitate washing, the flowsheet does not include side streams such as acid washes of the empty tanks that would go directly to waste. The calculation also neglects tank heels.
- Research Organization:
- Savannah River Site (US)
- Sponsoring Organization:
- US Department of Energy (US)
- DOE Contract Number:
- AC09-96SR18500
- OSTI ID:
- 760272
- Report Number(s):
- WSRC-TR-2000-00219
- Country of Publication:
- United States
- Language:
- English
Similar Records
Am/Cm Vitrification Process: Pretreatment Material Balance Calculations
Am/Cm Vitrification Process: Vitrification Material Balance Calculations
Am/Cm Vitrification Process: Vitrification Material Balance Calculations
Technical Report
·
Wed Feb 21 23:00:00 EST 2001
·
OSTI ID:775071
Am/Cm Vitrification Process: Vitrification Material Balance Calculations
Technical Report
·
Tue Aug 15 00:00:00 EDT 2000
·
OSTI ID:760271
Am/Cm Vitrification Process: Vitrification Material Balance Calculations
Technical Report
·
Wed Feb 21 23:00:00 EST 2001
·
OSTI ID:775070