Business case study Los Alamos National Laboratory Technical Area 3: Revitalization
It is the conclusion of this study that Los Alamos National Laboratory (Laboratory) will gain dramatically from revitalization of Technical Area 3 (TA-3) by providing a premiere facility for the US National Laboratory system, the Laboratory will be able to recruit and retain the best available expertise to help fulfill its mission, and plan for the future mission of LANL. The costs of TA-3 revitalization have been estimated at $200 million, however utilizing alternative construction and financing, commercial construction can dramatically reduce these costs and Third Party financing can reduce the overall estimated costs by nearly 50%. In addition, the costs of construction can be captured through savings in staff efficiency, energy efficiency, and reduced maintenance costs of the now aging infrastructure.
- Research Organization:
- Los Alamos National Lab., NM (US)
- Sponsoring Organization:
- US Department of Energy (US)
- DOE Contract Number:
- W-7405-ENG-36
- OSTI ID:
- 760075
- Report Number(s):
- LA-SUB-00-53
- Country of Publication:
- United States
- Language:
- English
Similar Records
The engineering institute of Los Alamos National Laboratory
Los Alamos National Laboratory Floodplain Assessment for the Technical Area 72 Outdoor Live Fire Range Safety Upgrades Project
Materials Capability Review Los Alamos National Laboratory April 29-May 2, 2012
Journal Article
·
Mon Dec 31 23:00:00 EST 2007
· Noise and Vibration Magazine, Korean Society for Noise and Vibration Engineering
·
OSTI ID:956628
Los Alamos National Laboratory Floodplain Assessment for the Technical Area 72 Outdoor Live Fire Range Safety Upgrades Project
Technical Report
·
Mon Jan 31 23:00:00 EST 2022
·
OSTI ID:1856111
Materials Capability Review Los Alamos National Laboratory April 29-May 2, 2012
Conference
·
Fri Apr 20 00:00:00 EDT 2012
·
OSTI ID:1039308