Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Frequency tuning of the CEBAF upgrade cavities

Conference ·
Long-term plans for CEBAF at Jefferson Lab calls for achieving 12 GeV in the middle of the next decade and 24 GeV after 2010. In support of these plans, an Upgrade Cryomodule capable of providing more than twice the voltage of the existing ones is under development. One requirement is to operate the superconducting cavities, which are 40% longer than existing ones, at 2.5 times the original design gradient with the same amount of rf power. This puts stringent requirements on the accuracy of the frequency tuner: range of 400 kHz and resolution of 1 Hz. A new tuner design to meet these requirements is under development. This system avoids problem areas of previous designs by holding to the principles of not placing moving parts in the vacuum and/or low temperature space, and of having all drive components readily accessible for maintenance and replacement without cryomodule warm-up.
Research Organization:
Thomas Jefferson National Accelerator Facility, Newport News, VA (US)
Sponsoring Organization:
USDOE Office of Energy Research (ER) (US)
DOE Contract Number:
AC05-84ER40150
OSTI ID:
755239
Report Number(s):
DOE/ER/40150-1427; JLAB-ACT-99-05
Country of Publication:
United States
Language:
English

Similar Records

Development of a cryomodule for the CEBAF upgrade
Conference · Tue Nov 30 23:00:00 EST 1999 · OSTI ID:754774

Upgrade of the CEBAF acceleration system
Conference · Sun Feb 28 23:00:00 EST 1999 · OSTI ID:754645

Development and Testing of a Prototype Tuner for the CEBAF Upgrade Cryomodule
Conference · Fri Jun 01 00:00:00 EDT 2001 · OSTI ID:783666