Fast feedback system for energy and beam stabilization
Conference
·
OSTI ID:754624
The electron beams being delivered to targets of the Continuous Electron Beam Accelerator Facility (CEBAF) at Thomas Jefferson National Accelerator Facility (Jefferson Lab) are plagued with undesirable positional and energy fluctuations. These fluctuations primarily occur at harmonics of the power line frequency (60, 120, 180, etc. hertz), and their cause is rooted in electromagnetic fields generated by accelerator electronic equipment. It is possible to largely nullify these deviations by applying real time corrections to electromagnets and RF verniers along the beam line. This concept has been successfully applied at Jefferson Lab by extensively modifying the existing Beam Position Monitor (BPM) system with the integration of an algorithm that computes correction signals targeted at the power line harmonics. Many of the modifications required were due to the existing CEBAF BPM system not having the data acquisition bandwidth needed for this type of feedback system. This paper will describe the techniques required to transform the CEBAF standard BPM system into a high speed practical fast feedback system that coexists with the large scale control system--the Experimental Physics and Industrial Control System (EPICS)--that runs the CEBAF accelerator in daily operation.
- Research Organization:
- Thomas Jefferson National Accelerator Facility, Newport News, VA (US)
- Sponsoring Organization:
- USDOE Office of Energy Research (ER) (US)
- DOE Contract Number:
- AC05-84ER40150
- OSTI ID:
- 754624
- Report Number(s):
- DOE/ER/40150-1302; JLAB-ACE-99-10
- Country of Publication:
- United States
- Language:
- English
Similar Records
Development of digital feedback systems for beam position and energy at the Thomas Jefferson National Accelerator Facility
Overview Of Control System For Jefferson Lab`s High Power Free Electron Laser
Operational experience with the CEBAF control system
Conference
·
Sun Jun 01 00:00:00 EDT 1997
·
OSTI ID:489673
Overview Of Control System For Jefferson Lab`s High Power Free Electron Laser
Conference
·
Tue Dec 30 23:00:00 EST 1997
·
OSTI ID:629003
Operational experience with the CEBAF control system
Technical Report
·
Tue Oct 01 00:00:00 EDT 1996
·
OSTI ID:378907