CALDERON COKEMAKING PROCESS/DEMONSTRATION PROJECT
This project which deals with the demonstration of a full size commercial coking retort using Calderon's proprietary technology for making metallurgical coke ran into a commercialization problem by virtue that the designed retort for two (2) tons of coke/hour necessitates thirty-two (32) retorts to produce the 500,000 tons of coke per year for a commercial plant. Bechtel Mining and Metals prepared a cost estimate of the commercial plant which indicated the commercial plant would not be economically feasible. The activity during this reporting period was directed to making changes to the design of the coking retort in order to reduce the number of retorts required for a 500,000 ton/year commercial coke facility. The result of this activity resulted in the drastic reduction of the number of retorts to eight (8) with each retort projected to produce 8.17 tons of coke/hour. Such decrease in number of retorts makes the Calderon technology quite competitive and therefore commercially feasible.
- Research Organization:
- Federal Energy Technology Center (FETC), Morgantown, WV, and Pittsburgh, PA
- Sponsoring Organization:
- USDOE
- DOE Contract Number:
- FC22-95PC92638
- OSTI ID:
- 7469
- Report Number(s):
- DE-FC22-95PC92638-05; ON: DE00007469
- Country of Publication:
- United States
- Language:
- English