Title: Minimum 186 Basin levels required for operation of ECS and CWS pumps

Technical Report ·
DOI:https://doi.org/10.2172/7368625· OSTI ID:7368625

Operation of K Reactor with a cooling tower requires that 186 Basin loss of inventory transients be considered during Design Basis Accident analyses requiring ECS injection, such as the LOCA and LOPA. Since the cooling tower systems are not considered safety systems, credit is not taken for their continued operation during a LOPA or LOCA even though they would likely continue to operate as designed. Without the continued circulation of cooling water to the 186 Basin by the cooling tower pumps, the 186 Basin will lose inventory until additional make-up can be obtained from the river water supply system. Increasing the make-up to the 186 Basin from the river water system may require the opening of manually operated valves, the starting of additional river water pumps, and adjustments of the flow to L Area. In the time required for these actions a loss of basin inventory could occur. The ECS and CWS pumps are supplied by the 186 Basin. A reduction in the basin level will result in decreased pump suction head. This reduction in suction head will result in decreased output from the pumps and, if severe enough, could lead to pump cavitation for some configurations. The subject of this report is the minimum 186 Basin level required to prevent ECS and CWS pump cavitation. The reduction in ECS flow due to a reduced 186 Basin level without cavitation is part of a separate study.

Research Organization:
Savannah River Site (SRS), Aiken, SC (United States)
Sponsoring Organization:
USDOE; USDOE, Washington, DC (United States)
DOE Contract Number:
AC09-89SR18035
OSTI ID:
7368625
Report Number(s):
WSRC-RP-92-1092; ON: DE93016744
Country of Publication:
United States
Language:
English