Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Transuranium Processing Plant semiannual report of production, status, and plans for period ending June 30, 1975

Technical Report ·
DOI:https://doi.org/10.2172/7365376· OSTI ID:7365376
During the period January 1, 1975, through June 30, 1975, the following amounts of transuranium elements were recovered from 22 irradiated HFIR targets: 2g /sup 243/Am, 59 g /sup 244/Cm, 51 mg /sup 249/Bk, 465 mg /sup 252/Cf, 2.5 mg /sup 253/Es, and 1.4 pg /sup 257/Fm. In addition, 45 mg of high-purity /sup 248/Cm was operated from /sup 252/Cf which had been recovered and purified during earlier periods, and 56 mg of a lower-quality /sup 248/Cm was separated from californium purification rework solutions. Five HFIR targets, each containing approximately 9 g of actinides (predominantly curium), were fabricated. A new long-term projection showed that /sup 252/Cf production in the TRU-HFIR complex could increase to as much as 2.5 g/year. During the next 18 months, we expect to recover totals of 46 mg of /sup 249/Bk, 520 mg of /sup 252/Cf, 2.0 mg of /sup 253/Es (in a mixture of isotopes), 220 ..mu..g of high-purity /sup 253/Es, and 1.6 pg of /sup 257/Fm. We also expect to obtain 125 mg of high-purity /sup 248/Cm from purified californium now in storage. There are no plans to process any of the remaining SRP Pu-Al tubes or to irradiate any plutonium targets in the HFIR; thus, we do not expect to recover any /sup 244/Pu. No changes were made in the chemical processing flowsheets normally used at TRU. Two neutron sources were fabricated, bringing the total fabricated to 77. In special projects, we (1) produced about 1 mg of /sup 250/Cf by irradiation of /sup 249/Bk in HFIR rabbits, and (2) processed some irradiated /sup 248/Cm samples and obtained yield and isotopic composition data for use in determining the capture cross section of /sup 249/Cm in the HFIR. The values that are currently being used for transuranium element decay data and for cross-section data in planning irradiation-processing cycles, calculating production forecasts, and assaying products are tabulated in the Appendix.
Research Organization:
Oak Ridge National Lab., Tenn. (USA)
DOE Contract Number:
W-7405-ENG-26
OSTI ID:
7365376
Report Number(s):
ORNL-5084
Country of Publication:
United States
Language:
English