Basic estimated capital investment and operating costs for underground bituminous coal mines: mines with annual production of 1. 06 to 4. 99 million tons from a 72-inch coalbed. [Consists almost entirely of tables]
Technical Report
·
OSTI ID:7354212
This study estimates capital investment, operating costs, and selling prices for four underground bituminous mines producing coal with annual production ranging from 1.06 to 4.99 million tons. It is assumed that the mines have a 20-year life. Wages and union welfare payments are considered as of November 12, 1973, under the Bituminous Wage Agreement of 1971, and costs for material and equipment are based on 1973 indexes. Initial capital investment ranges from $12,540,700 for the 1.06-million-ton-per-year (MM tpy) mine to $44,720,500 for the 4.99 MM tpy mine. Total capital investment ranges from $21,850,700 to $75,693,500 for the same mines. Corresponding selling prices for the coal range from $8.76 to $7.53 per ton, assuming a 12-percent discounted cash flow rate of return after Federal income taxes.
- Research Organization:
- Bureau of Mines, Morgantown, W.Va. (USA)
- OSTI ID:
- 7354212
- Report Number(s):
- BM-IC-8632
- Country of Publication:
- United States
- Language:
- English
Similar Records
Basic estimated capital investment and operating costs for underground bituminous coal mines. Mines with annual production of 1. 06 to 4. 99 million tons from a 72-inch coalbed. Information circular, 1976
Basic estimated capital investment and operating costs for underground bituminous coal mines. Mines with annual production of 1. 03 to 3. 09 million tons from a 48-inch coalbed
Basic estimated capital investment and operating costs for underground bituminous coal mines utilizing a continuous mining system. [Effect of mine size and DCF]
Technical Report
·
Thu Apr 01 04:00:00 UTC 1976
·
OSTI ID:7325727
Basic estimated capital investment and operating costs for underground bituminous coal mines. Mines with annual production of 1. 03 to 3. 09 million tons from a 48-inch coalbed
Technical Report
·
Sat Nov 01 04:00:00 UTC 1975
·
OSTI ID:7328610
Basic estimated capital investment and operating costs for underground bituminous coal mines utilizing a continuous mining system. [Effect of mine size and DCF]
Technical Report
·
Wed Nov 01 04:00:00 UTC 1978
·
OSTI ID:6421799
Related Subjects
01 COAL, LIGNITE, AND PEAT
012000* -- Coal
Lignite
& Peat-- Mining
015000 -- Coal
Lignite
& Peat-- Economic
Industrial
& Business Aspects
29 ENERGY PLANNING, POLICY, AND ECONOMY
294001 -- Energy Planning & Policy-- Coal
BITUMINOUS COAL
BLACK COAL
CAPITAL
CARBONACEOUS MATERIALS
COAL
COAL MINES
COST
ENERGY SOURCES
FORECASTING
FOSSIL FUELS
FUELS
INVESTMENT
MINES
MINING
OPERATION
TRADE
UNDERGROUND MINING
012000* -- Coal
Lignite
& Peat-- Mining
015000 -- Coal
Lignite
& Peat-- Economic
Industrial
& Business Aspects
29 ENERGY PLANNING, POLICY, AND ECONOMY
294001 -- Energy Planning & Policy-- Coal
BITUMINOUS COAL
BLACK COAL
CAPITAL
CARBONACEOUS MATERIALS
COAL
COAL MINES
COST
ENERGY SOURCES
FORECASTING
FOSSIL FUELS
FUELS
INVESTMENT
MINES
MINING
OPERATION
TRADE
UNDERGROUND MINING