Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

/sup 238/Pu surface contamination of MHW impact shell assembly

Technical Report ·
DOI:https://doi.org/10.2172/7343891· OSTI ID:7343891
/sup 238/PuO/sub 2/ contamination of the grit blasted surface of the primary impact shell assembly (PISA) of the multi-hundred watt isotopic heat source was measured. The study determined the amount and distribution of the /sup 238/PuO/sub 2/ and characterization of its behavior during aging at 1350/sup 0/C. The results concluded that normal decontamination effectively removes the superficial /sup 238/PuO/sub 2/ but does not extract the /sup 238/PuO/sub 2/ which is deep within the grit blasted structure. Subsequent heating results in migration of microcurie amounts of plutonium out of the grit blasted structure.
Research Organization:
Mound Lab., Miamisburg, Ohio (USA)
DOE Contract Number:
EY-76-C-04-0053
OSTI ID:
7343891
Report Number(s):
MLM-2379
Country of Publication:
United States
Language:
English