Operations models for Central Valley Project
System optimizing procedures are being developed for on-line use in the operation of the Central Valley Project (CVP), a complex multiple objective water resource system, in California. The project is subject to requirements and interagency agreements. A practical optimization method must address not only these requirements but also the continuing needs of day-to-day operation, and the necessity for interposing the project managers in monitoring and final decision roles. The basic technical difficulty with an optimizing algorithm for a complex water resource system is the dimensionality which can easily run into the tens of thousands of decision variables and constraints. The method being developed for the project provides the necessary decomposition and involves the project managers, assisted by an integrated group of multiple policies based on interconnected monthly, daily, and hourly models, using iterated linear programming-dynamic programming techniques.
- Research Organization:
- Bureau of Reclamation, Sacramento, CA
- OSTI ID:
- 7329032
- Journal Information:
- J. Water Resour. Plann. Manage. Div., Am. Soc. Civ. Eng.; (United States), Vol. 102:WR1
- Country of Publication:
- United States
- Language:
- English
Similar Records
Multiobjective analysis of multireservoir operations
PipeSight: A High-Performance Computing Platform for Pipeline Integrity Management
Related Subjects
HYDROELECTRIC POWER PLANTS
OPERATION
WATER RESERVOIRS
WATER RESOURCES
MANAGEMENT
AUTOMATION
CALIFORNIA
COMPUTERS
MATHEMATICAL MODELS
OPTIMIZATION
NORTH AMERICA
POWER PLANTS
SURFACE WATERS
USA
WESTERN REGION
130100* - Hydro Energy- Resources & Availability
130300 - Hydro Energy- Plant Design & Operation