Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Audible noise performance of the first three-phase ultra-high voltage transmission test line at EPRI's Project UHV

Conference · · IEEE Trans. Power Appar. Syst.; (United States)
OSTI ID:7325450
A three-phase ultrahigh voltage transmission test line at EPRI's Project UHV was energized in January 1975. Analyses of the audible noise performance of the first six-months of energization are presented. The result of long-term energization during foul-weather are reported in terms of cumulative frequency distributions, lateral profiles and frequency spectra. Audible noise variations with voltage in rain and fair weather are also presented. Results are compared with calculations made on the basis of single-phase tests. Good agreement between measured and calculated performances is demonstrated.
Research Organization:
General Electric Co., Pittsfield, MA
OSTI ID:
7325450
Conference Information:
Journal Name: IEEE Trans. Power Appar. Syst.; (United States) Journal Volume: PAS-95:4
Country of Publication:
United States
Language:
English

Similar Records

Three-phase UHV AC transmission research, 1977-1979. [1000 and 1500 kV]
Technical Report · Fri May 01 00:00:00 EDT 1981 · OSTI ID:6513824

Project UHV begins testing DC's non-biological effects
Journal Article · Thu Nov 30 23:00:00 EST 1978 · Electr. Light Power (Boston); (United States) · OSTI ID:6388183

Three-phase testing facilities at EPRI's Project UHV
Conference · Wed Dec 31 23:00:00 EST 1975 · IEEE Trans. Power Appar. Syst.; (United States) · OSTI ID:7089049