Implementation and acceptance testing of the seismic communication and control processor. Interim technical report, 15 Sep 1974--6 Feb 1976
Technical Report
·
OSTI ID:7311079
The Seismic Communication and Control Processor (CCP) was assembled and programmed during the period September 1974 to August 1975 using the BBN PLURIBUS multiprocessor architecture. Acceptance testing of the CCP was dependent on and interwoven with implementation and testing of the other nodes in the Seismic Data Network. Acceptance testing was divided into five phases. The last test phase was completed February 6, 1976.
- Research Organization:
- Bolt, Beranek and Newman, Inc., Cambridge, MA (USA). Computer Systems Div.
- DOE Contract Number:
- F08606-75-C-0022
- OSTI ID:
- 7311079
- Report Number(s):
- AD-A-033541; BBN-3349
- Resource Relation:
- Other Information: Includes rept. No. BBN--3185 dated 9 Apr 1976
- Country of Publication:
- United States
- Language:
- English
Similar Records
Refinements and operator training for the seismic communication and control processor system. Interim technical report, 6 Feb--31 Jun 1976
Initial drum retrieval. Interim report, July 1974--September 1976
Nonequilibrium phenomena in flowing plasmas and at high magnetic fields. Interim report, 15 Feb 1974--14 Feb 1975
Technical Report
·
Thu Nov 18 00:00:00 EST 1976
·
OSTI ID:7311079
Initial drum retrieval. Interim report, July 1974--September 1976
Technical Report
·
Sun May 01 00:00:00 EDT 1977
·
OSTI ID:7311079
Nonequilibrium phenomena in flowing plasmas and at high magnetic fields. Interim report, 15 Feb 1974--14 Feb 1975
Technical Report
·
Tue Apr 01 00:00:00 EDT 1975
·
OSTI ID:7311079
+1 more