Preliminary feasibility study of a grid-connected integrated community energy system at Clark University. Volume I. Executive summary

Technical Report ·
DOI:https://doi.org/10.2172/7295562· OSTI ID:7295562
A feasibility study of grid-connected co-generation (ICES) was conducted at Clark University. A summary of the accomplishments of Phase I shows that Clark University is attractive for an ICES demonstration project. Details of the study are summarized in five sections: preliminary energy and economic analysis, preliminary institutional assessment, conceptual design, commitments confirmation, and work management plan. (MCW)