Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Developing/modifying coal grinding procedures and equipment to produce predictable size distributions during coal preparation. Monthly progress report, August 1977

Technical Report ·
DOI:https://doi.org/10.2172/7289872· OSTI ID:7289872
A summary of analyses on the Ohio No. 9 coal sample was prepared since it is the potential feedstock to the CONOCO gasification project. Initial results on the mechanical properties of the coals were also obtained. The hammer mill grinding system and the ball and race mill grinding system have been installed. Testing of various coal samples has been underway in the air swept ball mill grinding system. Modifications to the wet ball mill were delayed while an emergency repair of the sample preparation crusher was made. The data obtained during testing have been summarized and presented in a simple form.
Research Organization:
Kennedy Van Saun Corp., Danville, Pa. (USA)
OSTI ID:
7289872
Report Number(s):
FE-2475-12
Country of Publication:
United States
Language:
English