skip to main content
OSTI.GOV title logo U.S. Department of Energy
Office of Scientific and Technical Information

Title: Experience with an integrated control and monitoring system at the El Segundo generating station

Conference · · Proceedings of the American Power Conference; (United States)
OSTI ID:7238796
;  [1]; ;  [2]
  1. Southern California Edison Co. (US)
  2. Electric Power Research Inst. (US)

This paper describes the EPRI/Southern California Edison (SCE) El Segundo Integrated Control and Monitoring System (ICMS) project and relates key project experiences. The ICMS project is a cost-shared effort between EPRI and SCE designed to address the issues involved with integrating power plant diagnostic and condition monitoring with control. A digital distributed control system retrofit for SCE's El Segundo Units 3 and 4 provided the case study. although many utilities have retrofitted power plant units with distributed control systems (DCS's) and have applied diagnostics and monitoring programs to improve operations and performance, the approach taken in this project, that is, integrating the monitoring function with the control function, is profoundly new and unique. Over the life of the El Segundo ICMS, SCE expects to realize savings form life optimization, increased operating flexibility, improved heat rate, reduced NO{sub x} emissions, and lower maintenance costs. These savings are expected to be significant over the life of the system.

OSTI ID:
7238796
Report Number(s):
CONF-920432-; CODEN: PAPWA
Journal Information:
Proceedings of the American Power Conference; (United States), Vol. 54:1; Conference: 54. annual American power conference, Chicago, IL (United States), 13-15 Apr 1992; ISSN 0097-2126
Country of Publication:
United States
Language:
English