Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Clean coal: what does it cost at the busbar

Journal Article · · EPRI J.; (United States)
OSTI ID:7237526

Ten major options are proposed as an adequate set of variables for evaluating coal fuel technologies. Present standards apply only to direct firing of coal and concentrate on removing 80 to 90% of sulfur oxides. Capital and busbar power costs are compared to select the ten best ways to burn coal. Cost estimates of plants will be used in determining research and development programs for coal utilization and coal conversion. Direct firing options are (1) pulverized low-sulfur coal, (2) high-sulfur coal with wet alkali scrubbing and on-site disposal of sludge, (3) pulverized high-sulfur coal with regenerative scrubbing and gas reduction to elemental sulfur, (4) pulverized coal at atmospheric pressure in a fluidized bed containing dry limestone, and (5) pulverized solvent-refined coal. A liquid firing option uses petroleum-type fuel. Low-Btu gas firing offers two methods: (1) after gasification in a moving bed with Lurgi gasifier and acid gas removal by the Selexol process, and (2) after gasification in atmospheric, two-stage entrained gasifier, with acid gas removed by the Stretford process. Two medium-Btu gas firing methods are: (1) after gasification in slagging moving-bed gasifier with the Selexol process, and (2) after pressurized gasification in two-stage entrained gasifier with Selexol process. (DCK)

OSTI ID:
7237526
Journal Information:
EPRI J.; (United States), Journal Name: EPRI J.; (United States) Vol. 1:9; ISSN EPRJD
Country of Publication:
United States
Language:
English

Similar Records

Assessment of selexolVAcid gas removal powers for use with Lurgi gasification
Conference · Wed Dec 31 23:00:00 EST 1980 · Proc., Intersoc. Energy Convers. Eng. Conf.; (United States) · OSTI ID:5467225

Combustion Engineering Integrated Gasification Combined Cycle (IGCC) Repowering Project -- Clean Coal II Project. Annual report, November 20, 1990--December 31, 1991
Technical Report · Sun Feb 28 23:00:00 EST 1993 · OSTI ID:10188728

Coal gasification/combined cycle (electric power generating pilot plant)
Journal Article · Tue Dec 31 23:00:00 EST 1974 · Heat Eng. (Livingston, N. J.); (United States) · OSTI ID:5390306