Boundary control systems, assessment remedial investigation, draft final report. Version 2. 1. Volume 2
Technical Report
·
OSTI ID:7234276
The objectives of task 25 are to: (1) Monitor ground water levels and contaminant concentrations in the alluvial and Denver aquifers near the north and northwest boundaries; (2) Define migration pathways; and (3) Provide water quality and hydrologic data for the operation of these boundary systems. This draft final report presents an interpretation of the geological and hydrogeological conditions near the boundaries and a brief description of the sampling programs. The main text is divided into the following sections: (1) Introduction; (2) Presentation of data collection methodology, well installation, and monitoring networks; and (3) Description of alluvial and Denver formation geology.
- Research Organization:
- Environmental Science and Engineering, Inc., Denver, CO (United States)
- OSTI ID:
- 7234276
- Report Number(s):
- AD-A-278009/6/XAB; CNN: DAAK11-84-D-0016
- Country of Publication:
- United States
- Language:
- English
Similar Records
Boundary control systems assessment remedial investigation. Version 2. 2. Volume 3. Final report
Boundary control systems assessment remedial investigation. Version 2. 2. Volume 1. Final report
Boundary systems monitoring, task 25, draft final technical plan
Technical Report
·
Tue Oct 31 23:00:00 EST 1989
·
OSTI ID:7273673
Boundary control systems assessment remedial investigation. Version 2. 2. Volume 1. Final report
Technical Report
·
Tue Oct 31 23:00:00 EST 1989
·
OSTI ID:7163297
Boundary systems monitoring, task 25, draft final technical plan
Technical Report
·
Sat Jan 31 23:00:00 EST 1987
·
OSTI ID:220318