Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Processing of transuranic waste at the Savannah River Plant

Conference ·
OSTI ID:7229238
Transuranic wastes at the Savannah River Plant (SRP) have been retrievably stored on concrete pads since early 1972. This waste is stored primarily in 55-gallon drums and large carbon steel boxes. Higher activity drums are placed in concrete culverts. In support of a National Program to consolidate and permanently dispose of this waste, a major project is planned at SRP to retrieve and process this waste. This project, the TRU Waste Facility (TWF), will provide equipment and processes to retrieve TRU waste from 20-year retrievable storage and prepare it for permanent disposal at the Waste Isolation Pilot Plant (WIPP) geological repository in New Mexico. This project is an integral part of the SRP Long Range TRU Waste Management Program to reduce the amount of TRU waste stored at SRP. The TWF is designed to process 15,000 cubic feet of retrieved waste and 6200 cubic feet of newly generated waste each year of operation. This facility is designed to minimize direct personnel contact with the waste using state-of-the-art remotely operated equipment.
Research Organization:
Du Pont de Nemours (E.I.) and Co., Aiken, SC (USA). Savannah River Lab.
DOE Contract Number:
AC09-76SR00001
OSTI ID:
7229238
Report Number(s):
DP-MS-86-48; CONF-860905-22; ON: DE87002639
Country of Publication:
United States
Language:
English