Hanford Waste Vitrification Plant Project statement of work for the architect engineer services: Detailed design; Revision 4
The fundamental goal of the Defense Water Management Plan (DWMP) is to end present interim storage practices for defense wastes and to provide for permanent disposal. To achieve this goal, the DWMP established an objective that high-level waste be immobilized before shipment to a geologic repository. The Hanford Waste Vitrification Plant (HWVP) Project has been established to accomplish this objective. The goal of the HWVP is to vitrify pretreated waste into borosilicate glass, cast the glass into stainless steel canisters, and store the canisters at the Hanford Site until they are shipped to a federal geologic repository. This Statement of Work (SOW) describes the architect engineer (A/E) services required for the Detailed Design phase of the HWVP, which will provide the design media required for the procurement, construction, and acceptance testing of the HWVP Project. 23 refs., 4 figs., 3 tabs.
- Research Organization:
- Westinghouse Hanford Co., Richland, WA (United States)
- Sponsoring Organization:
- USDOE, Washington, DC (United States)
- DOE Contract Number:
- AC06-87RL10930
- OSTI ID:
- 721623
- Report Number(s):
- WHC-SP--0497-Rev.4; ON: TI92020096
- Country of Publication:
- United States
- Language:
- English
Similar Records
Hanford Waste Vitrification Plant Project Plan. Revision 1
Hanford Waste Vitrification Plant reference conceptual design report