Two Daily Lot Sample (DLS) failures occurred in Lot 9 of the MC2736 battery. The first DLS failed to reach the required voltage. X-rays were carefully reviewed for evidence of any condition which would impact battery performance. It was concluded that Serial No. 4422 failed because of oversized header potting. When the normal stack force used for closure welding was applied, it forced the header potting into the insulation sleeve. As a result, no pressure was applied to the cell stack. Because this condition could be detected on the standard battery x-rays, all x-rays for this lot were reviewed. No other batteries were found which showed any evidence of this problem. The second DLS failure produced no voltage when tested. Upon examination, the primer was found not to have ignited. Extensive investigation failed to determine the cause of the primer failure. The lot was accepted based on performance data from this and previous lots. This primer failure was shown to have no impact on the overall system reliability.
Research Organization:
General Electric Co., Largo, FL (United States). Neutron Devices Dept.
DOE Contract Number:
AC04-76DP00656
OSTI ID:
721067
Report Number(s):
GEPP-TM--1093; ON: TI91020467
Country of Publication:
United States
Language:
English

Similar Records

MC3755 Thermal Battery Lot No. 2 production summary and engineering process instruction manual
Technical Report · Thu Apr 27 00:00:00 EDT 1989 · OSTI ID:719803

Fuel failure Lot KY-928-Q D Reactor
Technical Report · Thu Feb 24 23:00:00 EST 1966 · OSTI ID:10174069

Process changes resulting from the investigation of uncured potting found on Lot 19 holders
Technical Report · Thu Apr 16 00:00:00 EDT 1992 · OSTI ID:10144473