Skip to main content
U.S. Department of Energy
Office of Scientific and Technical Information

Muon fluence measurements during the 1987-1988 fixed-target run

Technical Report ·
DOI:https://doi.org/10.2172/7198360· OSTI ID:7198360
Muon fluence and dose equivalent have been observed at the Fermilab site boundary for the MC, MW, and NM beam lines. For MC and MW, the 1987 annual dose equivalents of 2.9 and 1.2 mrem respectively, are less than the 10 mrem site boundary goal. For the new NM beam line, on the other hand, the observed value 13.1 mrem exceeded this operational goal. Indeed, it was this observation that necessitated the additional ''spoilers'' downstream of the E665 experiment. With these magnets in place, however, the 10 mrem goal should not be in jeopardy for future runs.
Research Organization:
Fermi National Accelerator Lab., Batavia, IL (USA)
DOE Contract Number:
AC02-76CH03000
OSTI ID:
7198360
Report Number(s):
FNAL-TM-1518; ON: DE88010375
Country of Publication:
United States
Language:
English

Similar Records

Muon fluence measurements at 800 GeV
Technical Report · Wed Oct 31 23:00:00 EST 1984 · OSTI ID:6050744

Site environmental report for calendar year 1987
Technical Report · Sun May 01 00:00:00 EDT 1988 · OSTI ID:7254019

Site environmental report for calendar year 1984
Technical Report · Wed May 01 00:00:00 EDT 1985 · OSTI ID:5559254